VIII. FLOORING CONTRACTORS
A.
Most
flooring contractors quote costs that include only the installation, sanding
and finishing of floors.
1.
This
generally includes all materials and supplies needed for proper
installation.
2.
If
there are wood stairs and landings, it is usually best to arrange with the
flooring contractor to sand and finish them as this will assure a more
consistent finish throughout.
3.
Some
contractors quote wood costs separately.
B.
The
following are not normally included in the price of a wood floor, unless
specifically stated in the contract:
1.
Site
preparation (installing or preparing subfloor, removing baseboards, clearing
rooms and removing furniture, masking off cabinets and closets against dust,
etc.).
2.
Installing
baseboards or other molding.
3.
Installing,
sanding and finishing stairs and landings.
4.
Cleaning
other than "broom clean".
C.
Make
no assumptions. Be sure to clarify with your flooring contractor what is and
is not included in the cost. While
many contractors will take on additional tasks, many will not. People often find that they can save
money by making their own arrangements to have this work done. Ask for an itemized list of all costs.